Concrete pouring for preventing flooding of 30 cm or 50 cm of meshed bar iron on ground concrete; excavation and environmental planning works; floor and wall coverings (screed, ceramics, floor covering, solid lam parquet, etc.) , Making external connections for prefabricated building (electrical, waste water, clean water), Permits and permissions to be obtained from the Municipality, Heating and cooling installation (Central heating, air-conditioner, etc.) For installation outside of Istanbul, accommodation and food expenses of assembly team, transportation and freight insurance will be met by our customer.